Power for the Olympics 2012

Power for the Olympics 2012

When Aggreko were asked to provide gas powered generator sets for the Olympic building sites in London they found that there was a requirement for gas boosters to increase the pressure into the gensets. The easiest and quickest way to achieve this was to build the boosters required in house. For this task they needed an electrical partner and TS247 were recommended. As a result TS247 manufactured the necessary control panels on time and on budget.